BPG, Leamington Spa
Client:
BPG
Project:
Leamington Spa
Project Duration:
16 weeks

This project involved converting an old restaurant spread across two floors of a four-story building into five luxury apartments in Leamington Spa.

As with most residential projects the logistics are often the main concern, working in areas where we are in close proximity of other residents and access routes and noise restrictions need to be considered in great detail, and in this case, it was no different. In order to minimise disruption to the residence within the proximity we set working hours between 9am and 5pm where noisy works could be carried out, therefore minimising the disruption to everyone in the vicinity. As well as this, we also informed all local residence when noisy works would be, providing them with our site managers name and number should they need to contact us. Our site manager was proactive throughout this process to ensure that the job ran smoothly throughout. In terms of access and egress routes, we solved this problem by creating a temporary hole in a non-structural wall, giving us access to a back stairway. This allowed us to come and go from site without having to use the buildings main entrance, therefore minimising disruption to everyone in the building.


See Case Study